QR Code QR Code
Post Offer Free
China Starwin Science&technology Co.Ltd
China Starwin Science&technology Co.Ltd  

Gold Index: 59516

You are here: home  > Antenna Supporting facilities  > De-icing system  > Starwin electrothermal film temperature controll De-icing System

Starwin electrothermal film temperature controll De-icing System 

Payment Terms: T/T 
Place of Origin: Shaanxi, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: Starwin De-icing System
Production Capacity: 500
Delivery Date: 1week
control system: auto/manual
main Characters: No people on duty, de-icing...
Means of Transport: Ocean,Land,Air
Packing: case
Brand Name: Starwin
temperature range: +5℃--+15℃

Starwin De-icing System Data sheet *No people on duty, de-icing automatically
*Flexible *Energy conservation *High adaptability *Environmental


Starwin De-icing System Data sheet 

 

1. System composing

The electrothermal film de-icing device is composed of heat preservation thermal insulation blanket, electrothermal film and temperature controller, the cross section shown as fig,1.1. Each electrothermal film is fixed on the back of antenna, and the cable should be connected to the dedicated distribution box through back structure.

                

                     Fig,1.1 Electrothermal film components

 

2. System configuration 

* Temperature sensor : install on the back of antenna to test antenna temperature

*Signal Distance Extender:install on the top of power supply cabinet to extend the distance for  

 signal transmitting from temperature sensor.

* Temperature control cabinet : install inside the room to supervise antenna temperature and 

  control heating system.

* Power supply cabinet: install at the bottom of antenna with electricity leakage protection switch 

  for protection of heating system 

* Heating system : install on the back of antenna , including heating film, insulation material , 

  aluminum –plastic panel

 

 

 

 

 

 

 

3. Snow Melting Principle
 *Far infrared polymer heating film and completed environmental friendly material are installed   

  beneath the dish.

* Large contacting area, high efficiency and low cost 

 

4. Product Characters
*No people on duty, de-icing automatically

*Flexible

*Energy conservation

*High adaptability

*Environmental protection

*Remote control by compute

*Professional installation team

 

5. System Operation

 Temperature range is set as +5°C~+15°C by the temperature controller of electrothermal film snow-melting device. There are two control mode: the first one is automatically operated by system. When the surface temperature is fall to 

+5°C, the system will operated automatically, and the system will auto off when the temperature is raise up to +15°C.

Another control system is manual control. Operate the snow-melting device when snowing, the device can be automatically operated during the temperature range of +5°~+15°C in the snowing period. The device can be closed when there is no snow and ice on the antenna reflector. As the antenna can operated well when the outdoor temperature is very low, so if there is no snow and ice there will be no need to operate the snow-melting device.

 

6. Construction technology

(More detailed user manual for installation will given to you once finish production and effect shipment) 

  1) Check and clean up the construction site: outer surface of the antenna should be carefully cleaned before installing system, in order to maintain the surface of the installation parts clean, no dust or oil;

  2) Installation of distribution box and temperature controller: Install the distribution box according the design requirement, install the temperature controller, AC contactor and other automatic control components;(the main components of distribution box has already been installed, the assist components can be installed according to the actual situation if the anything changed in the construction site)

  3) Installation of temperature transmitter: install the temperature controller according to the designed position on the back of satellite communication antenna, splice the transmitter by glue, and connected the lead to the temperature controller;

  4) Installation of electrothermal film: splice the electrothermal film on the back of each panel according the designed position by double faced adhesive tape or glue;

  5) Connecting: Connect every wire of the electrothermal film of the satellite communication antenna by dedicated connecting plug, and connected the main cable of each panel to the hub of satellite communication antenna, then connected to the distribution box through center back structure. All the cable should be protected by drivepipe. If the ribs of the panel hinder the connection cable of electrothermal film, there can be drilled on the ribs, but drilling should pay attention to avoid the ribs of the force concentrated area.

  6) Installation of temperature board: clipping XPE temperature board according each panel of antenna, and bond the glue surface on the back of electrothermal film and satellite communication antenna, exposed the surface with waterproof aluminum foil;

  7) Seal treatment: Use sealant to fill all the border that connection of temperature board and the metal skeleton of antenna and sealed up. And then use aluminum foil adhesive tape to seat the exposed seam and wire. Use rubber and plastic insulation board to fill the gap between the metal skeleton and insulation board;

  8) Reinforce: install PP on the back of satellite communication antenna to fix electrothermal film and insulation board;

  9)  Our engineer will do testing the all-in resistance and electrify and you also need to do the same thing at installation site;

  10) Check and acceptance at factory and you also need to do at installation site.

 

7. Construction Site Preparation

 

1). There should have control room, power distribution box location for installing the special electrothemal film snow-melting in the construction site. The control room should be as close as possible with the satellite antenna, and connect the cables system used to power distribution box, inspection and acceptance.

2). There should have construction electricity and other temporary facilities to meet the construction needs in the construction site;

3). There should have dedicated storage of construction material in the site to ensure the construction environment temperature is not lower than 5℃. If the construction environment temperature is below 0℃, warming measures should be taken on-site.

4). When construction personnel arrive at the site, the users need to provide the necessary power supply and other related facilities to coordinate.

 

8. Operation and Maintenance

 

1). This electro thermal film snow-melting device is mainly used for melting snow and de-icing in winter. Before winter comes, the users should check the system in advance to ensure the normal use in winter.

 

Check the followings:

a). check if the appearance of the various part of the device is intact; the appearance of various parts including the power distribution box and inner component, temperature controller, cables, wire sleeve, and antenna outer reinforcement panels.

b). check whether the resistance value of electro thermal film is normal or not; measure the resistance value of each heating zone at the wiring connect terminal in the power distribution box with multi-meter, each installation of antenna electro thermal film block possess 10% resistance value error, among which 5% of resistant value cause by electro thermal film, 5% resistant value caused by wiring.

c). check whether the system operate properly; provide power and start the system, set up the temperature of temperature controller 5℃ higher than the outdoor temperature under the current start state, make the system operate in such temperature and check whether it can operate properly.

Check the computer monitor function in the total control room is normal or not.

d). Insulation test; in the state of system start, use the electricity test pencil to test whether the surface of the power distribution box, temperature controller, each operate zone of the antenna and antenna back structure are electrically charged. Turn off the system after the above test pass, power-down so as to prepare for the use of snow-melting and de-icing in winter.

 

2). When winter comes and if you begin to use the device, first provide the power and turn on the temperature control system, then set up temperature control parameters according to the temperature control device manual and related requirement, then the device starts automatically. When special circumstance such as no snow in a long period, it also can turn off the control switch and cut down the total power supply, restart manually when needing snow-melting and de-icing.

 

3). After using in winter, re-check and test according to the description of item 4.1. If all goes well, close temperature control system and cut off the total power supply. If problems occur, please repair in time.

 

4). One year warranty of this electrothemal film snow-melting device, if the quality problems occur (not artificial damage) within one year warranty, our company will provide maintenance services by the best price. Please contact us if system in abnormal condition.

 

 


Ms. Amelia
skype Ms. Amelia

Tel: 86-29-88664381
Fax: 86-29-87650669
Mobile: 186 2931 3522
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

China Starwin Science&technology Co.Ltd [China (Mainland)]


Business Type:Manufacturer
City: Xi'an
Province/State: Shaanxi
Country/Region: China (Mainland)

Follow Us: Follow us on facebook Follow us on linkedin

amelia:   skype
Alex:   skype
Felix:   skype

You May Like: